Tuesday, 23 January 2018

Scenes from the January Working day

The restoration team had their first working day of 2018 on Saturday 21st January when the angles were riveted to the rear drag box plate.  The following pictures were taken during the process.  It must be stressed that the work could only take place with the co-operation of the works manager and his staff in providing access to the space and equipment.  This is much appreciated.



Ben and Cameron checking the gas lance at the start of the heating process
 
The process starting by heating the rivets

Georgie making sure the rivets are heated to the right temperature

The air powered riveting machine being used to make sure the results are consistent

Rueben and Matt setting up ready for the next rivet
All the angles riveted up and ready for the final machining of the side angles
The angles at the side of the plate will now need to be machined to form a tight joint between the angle and the plate.  This will be carried out in the loco works again with the co-operation of the team in the workshop.

Painting is continuing on the wheel sets and hopefully these will be turned out in Maunsell Green before too much longer.
 
The monthly "Official" working days will continue throughout the year with the next few dates being: February 10th, March 24th and April 14th. If you ar3e interested in helping with the physical work, or publicity and sales, please e mail us at the address below.
 
Thank you

Clive

Please remember that this work can only continue with the donations, support and interest that is forthcoming from all of our supporters. 
 
If you would like to help us to continue this work with a donation, please go to our BT MyDonate page
 
 
 or use the QR code below.
 
To contact us please E Mail us on thefenchurchfund@gmail.com
 
Thank you for your continued support and interest, it is much appreciated. With your help we should have a rolling chassis by the end of the near and hopefully a working loco in around 4 years.

Tuesday, 9 January 2018

Work since Christmas

There has been plenty of work progressing since the festivities, including machining and painting.  The angles that are to be used to fix the brake cylinder to the rear dragbox has been machined true and the faces are now exactly at 90 degrees.

Machining the angles

Ben Dingley machining the angle irons for hanging the brake cylinder from.
 

Carefully taking the first cut

 
Machining in progress

 

The finished article! Both outside edges are now perfectly at 90 Degree’s to each other.

Reaming the drag box holes 

Meanwhile the rear dragbox and angle irons were reamed through to finish size ready for riveting. This finishing with a bridge reamer ensures that the plate work and angle iron holes are perfectly inline and round!
 
Matt carefully reaming the holes

 
The reamed holes with a chamfer to allow the rivets to locate the plates correctly

Machining the coupling strengthening plate

Ben has also been busy at the beginning of the new year machining up the reinforcing plate for the front buffer beam where the draw-hook goes through!
 
Set up ready for machining to take place 
 
Machining in progress cutting the reliefs for the front buffer beam angle iron!
 
A day’s machining and the plate is ready for the front buffer beam assembly.

Wheel Painting

Thanks to the continuing support of the Works Managerwe are making progress on the wheel painting.  All the pitting is being filled on the wheels to produce a smooth finish when the top coat is applied. It would be impossible to carry out this work outside during the winter months.

Steve Booth has been busy filling in casting pits and sanding back the spokes for a lovely smooth finish

 
The fruits of Steve's labours.
A lot of time and efforts goes into the preparation work but this should pay off when we finally get to final top coat! The spokes are now starting to look very smooth compared to when Steve started!

Buffer Beam

The rear buffer beam has be brought into the relatively dry and less cold Villa for cleaning and drilling of rivet holes.
The Rear buffer beam set up on the tresstles
 
Following wire brushing the arc marks are again visible.
This work can only continue with the donations, support and interest that is forthcoming from our supporters. 
 
If you would like to help us with a donation, please go to our BT MyDonate page
 
 
 or use the QR code below.
Thank you for your continued support and interest, it is much appreciated.

Monday, 8 January 2018

Hope you all had a better new year than me! I spent from Boxing day round to the 3rd of January in Hospital, hence the lack of updates.  Hopefully a few reports should come through from the Villa Team in the not too distant future.


Friday, 22 December 2017

Christmas Greetings!

Wishing all our supporters a Merry Christmas and a happy and healthy New Year!

We value your support and interest in the restoration of the loco, and without your donations we could not continue the work we are doing.  It is our aim, funds permitting to have a rolling chassis by this time next year.  It will be a lot of hard work, but will be worth it!

If you would like to help us with a donation, please go to our BT MyDonate page https://mydonate.bt.com/events/27
or use the QR code below.

If you would like to contact us please use the following address:

Thank you for your continued support and interest, it is much appreciated.

Monday, 18 December 2017

Removing Rivets from the frames

This weekend saw yet more rivets being removed from the frames at Sheffield Park. Following the work on Saturday it was estimated that one more day would see the remaining 20 or so rivets removed and replaced with temporary bolts.
Cutting the head from one of the rivets
Once the heads were cut off the rivets the residue was ground away before using a short handled persuader to knock the rivet out of the hole.  However, if the rivet was too tight a hole was drilled through the remaining rivet and cut away with the gas before trying again to persuade the rivet to leave the hole.
Burning out the centre of the rivet before removal
Once it the crew were happy that the rivet would move a short handled persuader was used together with a dolly to drive it out. this is a two person job.
Ben holding the dolly whilst Stuart uses the short handled persuader
Stuart lining up the dolly with the rivet  prior to persuading it
The picture shows the setting up of the dolly so that an even persuasion can take place.  This usually consists of having to hit it around half a dozen times to get it out.
The reason for removing the rivets (and fitted bolts) is so that it will be possible to "flat pack" the existing frames so that they can be kept for reference until the new ones are erected.
Two rivets removed and two to go!
The picture above shows two of the rivets removed (top and bottom) with the middle two to be dealt with.  The remaining two have both been ground down to remove any of the head, and an attempt has been made on the lower of the two to remove it, but without success.  This was drilled and then a hole blown out with the gas before driving it out with the dolly and persuader. The upper of the two in the middle has not yet been struck.


The marking out of the frames is continuing and hopefully hole cutting can take place shortly. The drag box plate is awaiting turning over so that the bracket holes can be cut using the holes in the angle as a template. Once this is done the angles can be riveted on and final machining can take place.  This will then be thoroughly cleaned and painted and stored until needed to be placed in the erected frames.  The next of the "smaller" pieces to be worked on in the Villa will be the front and rear buffer beams.  This is likely to happen during the first quarter of 2018.


If you are in a position to help us, please email us at thefenchurchfund@gmail.com Thanks in anticipation.





Web Site (P27 page about to be updated): www.bluebell-railway.co.uk




Text Donations: To donate £10 text "FENC72 £10" to 70070


  • you can donate £1, £2, £3, £4, £5 or £10 just by changing the amount in the text massage.
  • you can also elect to Gift Aid your donation;
  • your operator's standard text charge applies.

Thursday, 14 December 2017

A few pictures from last weekend

On-Going Work

Just a few pictures of work that has been carried out.  These pictures were taken by Clive Emsley on Saturday and Sunday of last weekend.
The rear drag box plate with some of the angles temporarily attached
Many of the angles have been bolted on to the rear drag box plate prior to final drilling and riveting.  Once the angles are riveted on the vertical face of the angle will be milled to create a flush face with the plate.  The reason for doing it this way is to produce a tight joint between the two pieces.

A close up of the interface between the angle and the plate
All of the angles have now been cut from the stock material supplied by Tata Steel and are stored in the Villa. 
Angles of various sizes in the Villa
These angles are for many uses on the new frames, hence the different sizes and lengths! They range from angles to hold the buffer beams onto the frames to simple location brackets for various bits.  They will soon disappear once we start to set the frames up, early next year if all goes to plan.
Various plates waiting for processing
There are a number of plates for various purposes in store. These were part of the order from Tata steel and will require a minimum of work to finish them.
Three Horn wedges leaning against the blast pipe casting
The above picture shows three of the horn wedges cleaned up the previous weekend together with the blast pipe castings we obtained as part of an order for all three P class locos at the Bluebell Railway.  These castings will be machined only when they are required for assembly onto the locomotive.

Working Days

There is one more working day planned for 2017, and that is this coming Saturday 16th December.  We hope to be able to bring pictures of the work carried out early next week. 
Further working days have been planned throughout next year, on roughly monthly intervals. However, please check here for dates.  The first few for next year are on January 20th, February 10th and March 24th, which coincides with the Bluebell Railway Diesel Gala.  I will put a full list here after Christmas.

Sales and Information Stands

Below is a list of dates and locations for our sales and information stands for the next year, this is subject to alteration and will only happen if we can get people to run the stands.


Sat 10th March - Wealden Railway Group Annual Exhibition - Lancing Parish Rooms
Sat 24th / Sun 25th March - Bluebell railway Diesel Gala - Sheffield Park
Sat 19th / Sun 20th May - Bluebell Railway Branch Line Weekend - Sheffield Park
Sat 23rd / Sun 24th June - Bluebell Railway Model Railway Weekend - Horsted Keynes*
Sat 11th / Sun 12th August - Bluebell Railway - Steaming through the ages - Sheffield Park
Sat 1st September - Burgess Hill Model Railway Club Exhibition - Burgess Hill School for Girls
Sat 8th / Sun 9th September - Bluebell Railway Shareholders Weekend - Sheffield Park+
Sat 22nd / Sun 23rd September - Worthing Model Railway Exhibition - Durrington High School
Sat 13th / Sun 14th October - Bluebell Railway Autumn Steam Gala - Sheffield Park
Sat 3rd / Sun 4th November - West Sussex N Gauge Group Exhibition - Angmering School
* Location to be confirmed
+Worksite open for inspection (subject to agreement)




At some of the Model Railway Exhibitions, and some that are not listed above, it is possible that we will be represented by our supporting Model Shop, Harrison-Brown Models http://harrisonbrownmodels.co.uk/ from who's web shop you can obtain a number of our items on line!

Appeal for Help

We are looking for a group of people to help to run the sales and information stands to enable us to cover as many as possible.  The only qualifications you will need are a good sense of humour, a willingness to stand on cold drafty and sometimes damp platforms and a keenness to see small locos working on the Bluebell Railway!




Full training will be given, and indeed we might even learn from you! in addition to the qualifications noted above you will need to be a paid up member of the Bluebell Railway and will be required to attend a short safety briefing given by the Bluebell Railway.




If you are in a position to help us, please email us at thefenchurchfund@gmail.com Thanks in anticipation.








Web Site (P27 page about to be updated): www.bluebell-railway.co.uk




Text Donations: To donate £10 text "FENC72 £10" to 70070


  • you can donate £1, £2, £3, £4, £5 or £10 just by changing the amount in the text massage.
  • you can also elect to Gift Aid your donation;
  • your operator's standard text charge applies.







Monday, 11 December 2017

Wheel painting

An agreement has been made with the Works Manager to place the wheels inside the Works at Sheffield Park one set at a time for painting, subject to room being available.  The first set was placed on the track behind the Class 4 tank on Sunday afternoon.  They will be allowed to dry out before rubbing down and painting takes place.  Work will continue at weekends and during the week over the winter.

Waiting for the doors to open!


 The leading set of wheels were moved on Sunday afternoon ready to be put inside the works for drying, rubbing down and painting
In place ready for painting
The painting will be carried out by Matt Holloway, Jim Turtle and Steve Booth. Thanks are due to Chris Sheppard for allowing us space for the work and to Ben Dingley for arranging it.
 
Thanks for your continued interest and support, it makes it worthwhile!