Thursday, 7 June 2018

Hattons announce 4 new P Class Liveries

Four new liveries for the Hattons P class loco

A further drain on my personal resources has been announced today! 


Hattons are producing another 4 versions of the P Class tank. these will be available for delivery (we are told) on the 17th of August.  The versions announced include:
H4-P-013 - 5027 in ROD green
H4-P-014 - 5753 in ROD green
H4-P-015 - 27 in SE&CR full lined green (with polished brass)
H4-P-016 - 31556 in BR black with early emblem




You will notice that 2 of these versions are further livery variations on 27.  Firstly a pre-grouping SECR fully lined out Wainwright livery and ROD Plain Green livery. I am not sure at present if the "Bluebell" versions will be available in the Bluebell Shop, but the previous versions were.


I will be developing a display of the various versions or 27 for display on our sales and information stands as the year goes on.

Tuesday, 5 June 2018

An update on the frames at Sheffield Park


Talking of "you've been framed" at the weekend Matt has finished the task of painstakingly marking out all of the hole positions for the various rivets and bolts in the main frames! Just over 400 hundred holes in total have been accurately marked ready for drilling.  The task took around 24 man hours, spread over the last couple of months, this process was very dependant on the weather!

Following verification and a double check, (or measure twice cut once as the old boys say), we will be in a position to commence the drilling the main frames at our next working day later in the month!

Also the Vacuum Cylinder has been finally fitted together and tested.  This passed the test and is fit for use it has now been put into storage.  Once the frames are erected and ready the cylinder will be installed.   

Tools of the trade scattered on the frames as the rear of the frame plates are marked up. 
Each white chalk circle identifies a centre pop which is located at the centre of the hole.
The frame plates laid out on top of one another outside Wainwright House (the Villa)
ready for final marking.
The front of the frames being marked out with the holes for the cylinder block bolts
having been marked out and circled with white chalk
The rear of the frame plates finished and ready for drilling. If you look carefully you should be able to make out the centre popped marks which are within the white circles. These will enable the accurate location of the mag drill when it comes to drilling the various holes in the frames.
Marking out the cylinder centre line and cylinder block centre at a 1 in 9 incline from the centre axle. 
This is highlighted by the yellow chalk marks 
The vacuum cylinder freshly overhauled and tested to CEPS1019 on the test rig. 
The cylinder will now be placed in dry storage awaiting the
time that we are ready to install it within the new frames.
As always all donations to help us keep up the good progress are most welcomed so please visit our donate page via the link below or see us at the upcoming Bluebell Railway model weekend on the 23rd to 24th of June!

 
Please remember that this work can only continue with the donations, support and interest that is forthcoming from all of our supporters. 

 
If you would like to help us to continue this work with a donation, please go to our BT MyDonate page
 
 
 or use the QR code below.


Monday, 4 June 2018

2018 tee shirt is now in stock

It's arrived!

The new tee shirt design is now in stock. It will be available at the Bluebell model railway weekend at the end of the month and all of our stands during the year. 
They are available instantly in large and extra large with other sizes available to order.  They cost a mere £12 each (plus postage if ordered by post / email).
Every penny of the profit of these shirts goes directly to the restoration funds in aid of Project 27.

Please email the Fenchurch Fund for further details. thefenchurchfund@gmail.com

Please remember that this work can only continue with the donations, support and interest that is forthcoming from all of our supporters. 
 
If you would like to help us to continue this work with a donation, please go to our BT MyDonate page
 
 
 or use the QR code below.


Friday, 25 May 2018

A few pictures from last weekend

Just a few pictures of the work on the drag box and buffer beams.
Buffer beams being bolted up ready for riveting

The Drag Box plate with the angles now riveted up and painted

a buffer beam clamped and bolted in preparation of riveting

Another angle of the buffer beam
 As you can see there is plenty going on and plenty still to do!  It is hoped that as soon as the cylinders arrive back having been machined there will be the opportunity to start the erection of the new chassis and hopefully we will be putting the chassis on the wheels within the next 12 to 18 months.


Of course all of this costs plenty of money to continue, and if you would like us to spend some of yours on the project there are various ways it can be deposited with us.  For information on how to set up a standing order (with or without gift aid) please contact us by email at thefenchurchfund@gmail.com and we will be able to furnish you with the appropriate information.


We are also able to collect one off donations again either with or without gift aid please email for information.  Otherwise, there is the BT MyDonate page, the link is below.


 

 

 Thank you for your interest and support for the project, it is as always much appreciated.




Wednesday, 16 May 2018

Branch Line Weekend

This Weekend

Just a reminder that we will be having a sales and display stand on Platform 1 at Sheffield Park during the Branch Line Weekend on Saturday and Sunday this week.  We will be selling all the usual items and will have information available about the restoration progress.  We may need to close early on Saturday as we will be displaying at the BRPS AGM in Burgess Hill in the evening too!  Please pop along and say hello if you are at either event.


Tee Shirts

We have just ordered a limited number of Tee shirt, currently available in Large and Extra Large.  It will be possible to take orders for other sizes.  The tee shirt has been produced to commemorate the new frames for the loco and will be available shortly.  The picture below shows what it will look like.

These will be available shortly at a cost of £12 each with funds going directly to the restoration of Southern Railway locomotive No. A27.  The restoration of this Bluebell Railway locomotive is being carried out by the Small Engines Group supported by The Fenchurch Fund (Project 27) and is being funded entirely by public donations and support.





Please remember that this work can only continue with the donations, support and interest that is forthcoming from all of our supporters. 
 
If you would like to help us to continue this work with a donation, please go to our BT MyDonate page
 
 
 or use the QR code below.
























Wednesday, 9 May 2018

Working Day last Saturday


There was a working day last Saturday (5th May) and following this Ben Dingley has sent us some notes for a short update.  Photographs and a few more words will follow shortly.

Firstly we must welcome Matt to his lovely new house, which he moved into Saturday, and so was not present at the working day.  However his contribution behind the scenes is legend!.Sean Smeeth and Jim Turtle were present working with Ben who was also doubling up as running foreman in the loco yard.


We are delighted to announce that we have begun to assemble the up stand on the rear drag box.  This behaves as a frame stretcher and supports the bunker and cab floor.
Progress has been good on the erection of the rear buffer beam with only a few items left to make this a complete "sub-assembly".
The front buffer beam angle work is also progressing. All these angles and beams will be bolted up to ensure a good alignment and fit before riveting together can be carried out. Much of the machining of the angles that were delivered in October have been carried out and we are well on the way to completing this part of the restoration.Jim Turtle has been supporting Ben whilst he is recovering from an operation as he cannot do any lifting. Jim has assisted with measuring and drilling of drag box and buffer beam components as well as painting all of the parts in bonda primer before assembly.



Reuben and Sean have continued to support with the needle gunning and bead blasting of every item machined to remove mill scale to give a suitable surface for painting.  They have also assisted with some fitting up of the parts and drilling through the angle work.

Matt has tested the vacuum cylinder following a complete rebuild and this has been successful.  Matt is also continuing with bunker and tank drawings ready for then next stage of the rebuild.  Considerable progress has been made with the marking out of the new frames. The marking out will be independently checked  before any drilling takes place.  The old adage of measure 3 times and cut once is truly applicable here! A few more days of this glorious sunshine are required to compete the marking and checking, then we can start to drill.  Our next purchases are fitted rivets and white metal for the axleboxes.  Quotes have been obtained for these and they will be ordered later in the year, funds permitting. 



In his spare time (!) Matt is developing a website which will be launched later in the year. This will give information on the locos that the Little Engine Group will be supporting either directly or assisting and encouraging others who want to get involved in looking after the small locos.
We are also progressing with setting up a system where it will be possible to set up on line standing orders via PayPal.  More information regarding this will be forthcoming shortly.  
A Donation box has been placed on the platform adjacent to the ROD 27 tank.  we are just awaiting for another information board to be completed and fitted to give up to date information on it.



Thanks for your continued support and interest in the project, we are now seeing some really tangible progress on the restoration thanks to you, our supporters.

Please remember that this work can only continue with the donations, support and interest that is forthcoming from all of our supporters. 
 
If you would like to help us to continue this work with a donation, please go to our BT MyDonate page
 
 
 or use the QR code below.

--


Clive D. Emsley
Chairman - The Fenchurch Fund

A Sub-Committee of the Bluebell Railway Preservation Society
www.bluebell-railway.co.uk


Why not support us by making a donation at

Monday, 23 April 2018

A short round up

Just a short round up of the last 6 months or so of progress.

As you are probably aware we are now in possession of a new set of cylinders and a new set of frames for the locomotive.  The frames and associated parts are currently being carefully drilled and machined where required.  This is being done "in-house" under rather less than ideal circumstances at times by Matt, Ben and the usual suspects.  the smaller parts can be drilled inside the Villa, but the frames will need to be done outside.  This process will be dependant on the weather and temperature to enable accurate measurement and drilling.

The frames being cut at Tata Steel
The cylinders were cast from poly patterns and were delivered to Sheffield Park in the autumn of last year.  these have had around 6 months of seasoning in the outside atmosphere of Sheffield Park and are currently at Statfold Engineering for machining into useable items.  We are hopeful that the cylinders will be returned to us around June/July of this year.
Cylinders loaded up for dispatch to Statfold Engineering
We are also having all of the fitted bolts and a few other items machined at the same time, thus saving valuable machine shop time and volunteer resources at Sheffield Park. Once returned and the frames are drilled, it will be possible to plan the erection of the frames, currently planned to be carried out in the open air on the concrete area adjacent to the Villa.

This progress has not been cheap, but it has been necessary to progress the restoration.  Indeed this work has cost the Fenchurch Fund just under £20,000 and this has created a hole in the bank account, of course, this is money well spent.
One of the tanks that need replacement being tidied up for display on Platform 1

Our next expenditure will be the tanks and bunker plus repairs to the cab, though this cost will be mainly for materials.  As The Fenchurch Fund is entirely self funded, to allow work to continue, we must keep the funds rolling in!

Of course there is a big item we will need to fund in the not too distant future, the boiler!  This will include a full survey of the two P class boilers that are not in the working locos to see what can be used from these.  Additionally it is already known that there will need to be a fair amount of new boiler plate required to make sure we have a good boiler that will last many years.  It is likely that the boiler work will cost somewhere in the region of £100,000. 
A P class boiler (Currently in  No.178) The ones in store are not so good.
We will need to be able to pay for this when the time comes and currently we will fall short by a considerable sum.

So, how will we go about raising this money? I hear you ask.

Well, we will shortly be commencing a new monthly donation scheme by standing order directly to the Fenchurch Fund's account, or via the Bluebell Railway Trust if gift aid is appropriate.

If you are interested in helping us in this way, please send us an E mail (thefenchurchfund@gmail.com) and we will let you have the correct form as soon as the final loose end have been tied up, hopefully we will be launching the scheme in time for the BRPS AGM next month.

You can also donate via the link to the BT MyDonate page as shown below.

We need to especially those who have made donations large and small recently, it really does make a difference.

Thanks for your continued support and interest in the project, we are now seeing some really tangible progress on the restoration thanks to you, our supporters.

Please remember that this work can only continue with the donations, support and interest that is forthcoming from all of our supporters. 
 
If you would like to help us to continue this work with a donation, please go to our BT MyDonate page
 
 
 or use the QR code below.