The work last weekend consisted mainly of adding aluminimum sheeting to the outside of the villa (the wooden workshop used by the Project 27 gang). The cladding is being carried out to repair the poor condition of the wooden outer skin of the building. This is seen a short to medium term until a decission is made on the possible rebuilding of the workshop which will assist the project and other groups that use the area. This work will be carried out in conjunction with the loco director and other interested parties.
It is hoped to add some pictures of the work to this post later in the week.
No comments:
Post a Comment